Our references for special constructions

EXPO 2000 Hannover, Italian pavilion
Steel construction works - rotunda on welded tubular supports with inclined ramps as access routes, intermediate level and cupola-roof, ca. 1,280t steel, execution time March – May 2000.

EXPO 2000 Hannover, Spanish pavilion
Steel construction works for a pyramid-shaped construction with special architectural highlights and a statically complex welding construction, 850t welding profiles

EXPO 2000 Hannover, Finnish pavilion
Steel construction works, e.g. connecting stairs and façade sub-structure

CeBit Hannover 2004
Stand of Deutsche Telekom AG
Ellipse-shaped steel construction for receiving a decorative cladding with visual light-effects, ellipse 60m long, 30m wide from bent square profile 350 x 12mm (total weight ca. 25t) borne by supports of 6.50m height, cladding of the ellipse with 126m aluminium facing, diverse steel constructions for special presentations.

CeBit Hannover 2005
Conversion of the ellipse, additional production of ca. 25t cantilevers from QR 160 x 6.3, diverse steel constructions for special presentations.

CeBit Hannover 2006
Conversion of the ellipse to 70m length and 30m width, manufacturing of a football of 5.6m height from RR 80/40/5, manufacturing of a multi-media cube, side length 5.6m on rotating axis, diverse steel constructions for special presentations.

CeBit Hannover 2007
Amorphous steel girder from 40t steel to receive aluminium/cloth construction with visual light effects, additionally diverse special components.

Christmas pyramid 2005, Hannover
Manufacturing, delivery and installation of the steel sub-structure, for a hexagonal, one-storey Christmas pyramid, in container construction, incl. delivery of connection devices for the wood construction and the winged wheel.

World Cup fan shop 2006 (later Christmas pyramid)
Conversion and reinforcement of the existing construction of the 2005 Christmas pyramid and extension by one storey as meeting point and fan shop for the World Cup 2006 in Germany. For Christmas, this basic concept is converted to form a 2-storey Christmas pyramid.

Municipality of Celle
Visible roof construction from steel lattice formwork binders for the convention centre Congress Union Celle, ca. 125t

Volkswagen Wolfsburg
Volkswagen Auto City in Wolfsburg
Brand pavilions in sophisticated architecture: SEAT, AUDI, UTILITY VEHICLES, steel construction works with roofing

Lock Uelzen
Two units camera bridges from welded box girder profiles incl. chain-driven camera moving system, dimensions ca. 17m height, wingspan ca. 15m, with escape balcony, multi-colour aluminium window incl. sun screen, stair railings, handrails as well as all steel and fire protection doors, door systems; ca. 850m railings from powder-coated aluminium, numerous mechanical works, as well as projecting roofs, grids, crash safeguards, cladding, decorative elements, ventilation grids.

Sun Technics
Ca. 17t sub-structure, galvanized double support constructions to receive galvanized IPE-girders for screw connection of customer-provided collector consoles.

Cornils has been awarded the order to build two bridges on the premises of the Norddeutsche Affinerie in Hamburg.