CeBit Hannover 2004
Stand of Deutsche Telekom AG
Ellipse-shaped steel construction for receiving a decorative cladding with visual light-effects, ellipse 60m long, 30m wide from bent square profile 350 x 12mm (total weight ca. 25t) borne by supports of 6.50m height, cladding of the ellipse with 126m aluminium facing, diverse steel constructions for special presentations.
World Cup fan shop 2006 (later Christmas pyramid)
Conversion and reinforcement of the existing construction of the 2005 Christmas pyramid and extension by one storey as meeting point and fan shop for the World Cup 2006 in Germany. For Christmas, this basic concept is converted to form a 2-storey Christmas pyramid.
Lock Uelzen
Two units camera bridges from welded box girder profiles incl. chain-driven camera moving system, dimensions ca. 17m height, wingspan ca. 15m, with escape balcony, multi-colour aluminium window incl. sun screen, stair railings, handrails as well as all steel and fire protection doors, door systems; ca. 850m railings from powder-coated aluminium, numerous mechanical works, as well as projecting roofs, grids, crash safeguards, cladding, decorative elements, ventilation grids.
Sun Technics
Ca. 17t sub-structure, galvanized double support constructions to receive galvanized IPE-girders for screw connection of customer-provided collector consoles.














































