Falkenried, HH-Eppendorf
Restoration of the former vehicle workshops Falkenried, which are protected as a historic monument.
- Hall E:
Dismantling, restoration and re-installation of the existing historic steel-rivet construction (ca. 200t); delivery and installation of additional 280t new steel construction for fitting a mezzanine storey and new atriums, as well as roofing with KAL Zip, total 4,500m². During the construction stage the historic outside brick façades remained in place.
- Water tower:
Delivery and installation of the steel construction for restoration of and addition of stories to the water tower, which is protected as a historic monument; steel bearing construction for the new stacked storey (5th floor) with aluminium façade in cassette finish and roof and plumbing as well as mechanical works with new staircases and railings and replication of the existing historic railing for the new storey.

















