Our references in hall construction

Dr. Bode, Isernhagen
Here Cornils built a research and development hall for vehicle technology. In the administrative wing we realized a glass façade as post-and-beam construction; in the hall area we installed sandwich panels with concealed screw connection. The hall was built with a KAL-Zip aluminium roof with sub-casing/acoustic panel. The dimensions of the hall are 24.4 x 32.2m; the administrative wing is 24.5 x 10.2m.
In the area o the administrative wing a 2-storey large-area glazing structure, consisting of sun screen glass (Infrastopp Brilliant) was installed. In addition, the building received a reinforced concrete intermediate ceiling and an arched roof.
Construction time was 4 months, from August to mid-November 2002. The building was erected in Isernhagen- Kirchhorst.

WG Promotions, Wietzendorf
This is a production facility for advertising materials. The building received a sandwich panel of a strength of 60mm (hue: RAL 9006), which was non-visibly installed horizontally. The roof is a warm roof superstructure with dome lights. The dimensions of the hall are 25 x 50m. Its overall weight is ca. 67t.
The hall has a parapet and a pre-set 2-storey administrative wing (installation of an intermediate ceiling) with diagonal window façade.
Cornils constructed this hall as a turnkey project. In addition, a 2-casing fire wall was erected.

Reschke relocation, Winsen/Aller
Type-tested system steel hall as shipping warehouse, free-bearing, 21 x 37.50m, eaves height 5m.

Körber light engineering, Ronnenberg
3-storey system steel hall as extension of the existing production and administrative floors, with an entrance area as steel-glass construction.

Cornils has been awarded the order to build two bridges on the premises of the Norddeutsche Affinerie in Hamburg.